These are the events that took place on Saturday 2/1/20:
Programming:
- Organized the electrical board
- Ran testing on the lime lights
- Ran motors for outtake
- Fixed ultrasonic sensors
- Started work on the PID loop
- Testing on shooting design
- Figured out code to lime light and made it better
- Calculate how to keep it going to 60 while shooting
- Now know what number needed to make it work
CAD:
- Got the shooter side plates
- Getting the climb plates welded soon
- Made extra shooter adjusters in a different material just in case other weigh to much.
Mechanical:
- Got both of the elevators
- Attaching the side panels
- Intake finished
- All mini assembly for the climb
- Tested the lift design
PR:
- Chairmans video is finished
- Waiting to be published
Control Systems:
- Belly pan onto frame
- Installing poly carbonate
Along with all of this the blue alliance finally updated the app now you can-
- Stay up to date with your favorite teams with push notifications for match results with the myTBA notifications feature
- District ranking search tool
- A place to find where all the events will be webcasted